Who this is for
- A grill island with prep space and storage
- Full kitchens with side burners, refrigeration and a sink
- Bar-height counters with seating facing the pool or fire pit
- Pizza ovens and covered cooking areas
| Frame | Concrete block on footing, or aluminum frame |
|---|---|
| Finish | Stone veneer, stucco or matching paver units |
| Countertop | Granite, quartzite or porcelain slab |
| Utilities | Gas line, GFCI circuits, sink drain planned up front |
| Appliances | Stainless outdoor-rated grills, fridges, access doors |
| Clearances | Grill clearances per manufacturer; venting for enclosed grills |
Plan it with the patio
The best time to plan an outdoor kitchen is before the patio goes in. Gas and electric conduit get sleeved under the pavers, the kitchen gets a proper footing and the layout keeps smoke away from the house and seating.
Materials that handle the shore climate
Salt air near the ocean and rivers is hard on cheap stainless and untreated frames. We spec 304-grade stainless appliances and doors, sealed natural stone counters or porcelain, and block or aluminum frames that won't rot.
Licensed trades
Gas and electrical hookups are done by licensed plumbers and electricians with the permits your town requires.
Concept imageWhat happens after you call
- 01
Design meeting
Cooking style, appliance list, seating and where utilities run.
- 02
Drawings + estimate
Plan and elevation drawings with a line-item price.
- 03
Permits + utilities
Gas and electric permits, trenching and sleeves.
- 04
Build
Footing, frame, veneer, countertops, appliance install.
- 05
Hookup + test
Licensed gas and electric hookup, inspection, walkthrough.
Concept imageOutdoor Kitchens questions we hear on the phone
Do I need a permit for an outdoor kitchen?
Gas and electrical work need permits. Some towns also want a zoning review for permanent structures. We handle both.
Can you add a kitchen to my existing patio?
Often yes, if the patio base is solid. The kitchen still needs its own footing, so we cut in a section of the patio.
How long does it take?
Most kitchens take 2 to 4 weeks on site, plus appliance lead times.
